This web blog covers the common failure modes that are experienced by rail clamps. An inspection schedule is also discussed that, along with the manufacturer’s instructions, should help to keep rail clamps in reliable operating condition.
Paul Munzenberger is a Mechanical Engineer at Aspec Engineering with 13 years technical experience in the mining and materials handling industries. Paul is the Chairman of the RU002 Conveyor and Elevator Belting Australian Standard committee and holds a PHD.