Sydney Metro North West – Skytrain Proof Engineering
Rendel and ASPEC have been the the Impregilo-Salini Joint Venture (ISJV)’s Proof Engineer to perform an independent design check of the viaduct as well as the cable-stayed bridge. Final certification was issued on Monday 23 October 2017.